Meet the process of connection of a Portable Generator to an LV panel
The video shows all the process of connection and disconnection of a Portable Generator set to the LV Panel through the Integrated Compact Disconnector (ICD), simulating a situation of a main powergrid failure or a maintenance requiring a power cut.
Watch the step by step and discover how the current flows after a quick operation.
Related News
Pronutec to showcase smart grid monitoring and automation solutions at Enlit Europe 2026
Pronutec will participate in Enlit Europe 2026, taking place from 10 to 12 November in...
The DNA of an LV Distribution Panel: The Engineering That Defines It
If an LV distribution panel were a human body, its DNA would be the engineering...
The Muscular System of a Distribution Panel: Voltage as Working Capacity
If a low-voltage distribution panel were a human body, its muscular system would represent its...


















































































